Background Slide
OF OUR CUSTOMERS
AT THE SERVICE
INNOVATION
Background Slide
Background Slide
Background Slide
Background Slide
Background Slide

Our own constructive system is an exportable business model that facilitates the internationalisation of our activity anywhere in the world. We are currently present in 12 countries of 4 continents.

Panama
Vías Brasil Corridor – Sections 1 and 2
“Chicho Fabrega” Hospital
Usine de traitement d'eau de Santiago (Veraguas, Panama)
Port Punta Rincon – Minera
Usine Industrielle – Conteneurs de l’Itsme
Agrandissement Port De Rodman
Préfabriqués L2 Métro Panama
Métro Panama L2
Barrage Barro Blanco
Panama water treatment Plant (Panama)
Expansion Port Of Rodman
Institut Technique Supérieur de l’ Est -ITSE
Panama L2 Metro
Barrage Bajo Frío
Voies Collecteurs – Voie Brasil
Panama L1 Metro
Gamboa water treatment Plant (Colon, Panama)
Port Punta Rincon – Minera
Santiago water treatment Plant (Veraguas, Panama)
Ampliación Puerto de Rodman
Industrial Ship – Containers of Itsmo
Panama Canal
Presa Barroblanco
Station d'épuration du Panama (Panama)
Prefabricated L2 Subway Panama
Barro Blanco Dam
Usine de traitement d'eau de Gamboa (Colon, Panama)
Higher Technical Institute of the East -ITSE
Hôpital « Chicho Fabrega »
Vías Brasil Corridor – Sections 1 and 2
“Chicho Fabrega” Hospital
Usine de traitement d'eau de Santiago (Veraguas, Panama)
Metro Panamá L1
Port Punta Rincon – Minera
Metro Panamá L2
Usine Industrielle – Conteneurs de l’Itsme
Canal de Panama
Agrandissement Port De Rodman
Préfabriqués L2 Métro Panama
Métro Panama L2
Barrage Barro Blanco
Planta Tratamiento de Aguas Residuales ( Panamá)
Institut Technique Supérieur de l’ Est -ITSE
Métro Panama L1
Bajo Frío Dam
Voies Collecteurs – Voie Brasil
Panama L1 Metro
Planta Potabilizadora de Gamboa (Colon - Panamá)
Port Punta Rincon – Minera
Hospital "Chicho Fabrega"
Planta Potabilizadora de Santiago (Veraguas - Panamá)
Canal de Panamá
Nave Industrial – Envases del Itsmo
Panama Canal
Presa Bajo Frío
Panama water treatment Plant (Panama)
Expansion Port Of Rodman
Prefabricados L2 Metro Panamá
Panama L2 Metro
Barrage Bajo Frío
Gamboa water treatment Plant (Colon, Panama)
Instituto Técnico Superior del Este -ITSE
Hôpital « Chicho Fabrega »
Vías Colectoras – Vía Brasil
Santiago water treatment Plant (Veraguas, Panama)
Puerto Punta Rincón – Minera
Industrial Ship – Containers of Itsmo
Canal de Panama
Station d'épuration du Panama (Panama)
Prefabricated L2 Subway Panama
Barro Blanco Dam
Usine de traitement d'eau de Gamboa (Colon, Panama)
Higher Technical Institute of the East -ITSE
Métro Panama L1
Bajo Frío Dam
Imagen Valores
50 YEARS BUILDING THE STRUCTURE OF THINGS
Efficiency
Innovation
Experience
Excellence
Transparency
Compromise
Sustainability
Flexibility
Continuous improvement

OUR COMPREHENSIVE SOLUTION:
A REGISTERED CONSTRUCTION SYSTEM

We are the only company in the world that can offer a comprehensive solution for the engineering, supply, transformation and assembly of passive reinforcement steel in concrete structures in the construction sector.
  • We reduce accident rates and costs in the works.
  • We optimise the design of the project.
  • Ability to adapt to unexpected changes in the market volume.
  • Modelo único y fácilmente exportable

SPECIAL PROJECTS

Trabajos preliminares Cajones Gas VIEW PROJECT
Muro Pantalla Túnel Moss (NORUEGA) VIEW PROJECT
Puente Industrial (CHILE) VIEW PROJECT
Colector con Dovelas (Argentina) VIEW PROJECT
Panama L1 Metro VIEW PROJECT
Sidra Hospital VIEW PROJECT
Panama Canal VIEW PROJECT
Honaire Desalination Plant VIEW PROJECT
Morelia Motorway VIEW PROJECT
Algiers Airport (Control Tower) VIEW PROJECT
Guadalajara Light Rail Tunnel VIEW PROJECT
Gambeta Tunnel VIEW PROJECT

We create connections, we unite people and places

Specialisation, Innovation, Flexibility and Experience

© Copyrights 2017 ERSIGROUP - Legal Notice - Privacy Policy