Redevelopment of the M-30 Urban Motorway

Burying the M-30 urban motorway over a stretch of approximately 6 km to reclaim the banks of the River Manzanares, freeing the area from current traffic

Construction process based on excavation and backfilling protected by diaphragm walls

Construction of diaphragm walls, with a total weight per unit of 60 tonnes, using unidirectional and bidirectional panels

Use of screw-type couplings to ensure continuity of the slabs

details

  • Categories:
  • Civil Work
  • Subtype:
  • Motorways
  • Location:
  • Madrid
  • Customer:
  • Dragados, Acciona, FCC Construcción, Sacyr
  • Tn of Steel:
  • 300.000 Tons

WORK IMAGES

WORKS OF THE COUNTRY