Long Itchington Tunnel HS2- Salb Roofs

Design optimization, manufacture and fixing of pre-fabricated reinforcing steel structures

Run under the forest with a tunnel boring machine as environmental protection is an important part of the HS2 line strategy

Length 1.6 km

details

  • Categories:
  • Civil Work
  • Subtype:
  • Tunnels
  • Location:
  • United Kingdom
  • Customer:
  • ABM Precast Solutions
  • Tn of steel:
  • 500 Tons

work images