Long Itchington Tunnel HS2- Salb Roofs
Design optimization, manufacture and fixing of pre-fabricated reinforcing steel structures
Run under the forest with a tunnel boring machine as environmental protection is an important part of the HS2 line strategy
Length 1.6 km
details
- Categories:
- Civil Work
- Subtype:
- Tunnels
- Location:
- United Kingdom
- Customer:
- ABM Precast Solutions
- Tn of steel:
- 500 Tons
work images
