Expansion Port Of Rodman

DESCRIPTION

ERSI Group carried out prefabrication of reinforcing steel reinforcements (mobilisation, manufacture, cut and bend), prefabrication and assembly of piles, capitels, slabs and preslabs.

The work involves the construction of 800 metres of dock and the installation of eight  superpospanamax gantry cranes and 12 RTG cranes. All this will allow us to load and/or unload two mega-ships simultaneously. The depth of the terminal will be increased dredging four million cubic metres of material.

The ports of Panama are among the most important in the world and it is expected to increase the volume of ships that pass through them after completion of the works of the Panama Canal.

It is one of the most important ports in the world.

The capacity of the terminal will be expanded to 2 million TEU.

DETAILS

Categories:
Civil work
Subtype:
Maritime Works
Location of the works:
Panama
Customer:
Jan de Nul – Saipem Contracting
T of steel:
10,000 t
Workshop:

© Copyrights 2017 ERSIGROUP - Legal Notice - Privacy Policy