Barro Blanco Dam

DESCRIPTION

ERSI Group supplied, manufactured and assembled industrial corrugated steel reinforcements.

The Barro Blanco dam is located on the Tabasará river, in the province of Chiriquí. It is a hydroelectric energy project in Panama, with an installed capacity of approximately 29 MW and an estimated annual energy production of 135,000 MWh. It consists of a 55 m high (61 m including the base) dam with a built-in power that will lead to a reservoir of 235 ha (= 2.35 km2) at 103 m above sea level.

DETAILS

Categories:
Civil work
Subtype:
Hydraulic Work
Location of the works:
Panama
Customer:
Hidráulica San José
T of steel:
1,000 t

© Copyrights 2017 ERSIGROUP - Legal Notice - Privacy Policy