FR
ES
Home
Company
Our Identity
Our Story
Our Activity
ERSI Group policies
Integrated Management System Policy
HR Framework Policy and Social Policy
Suppliers commitments
Certificates
ISO 14001:2015
ISO 45001:2018
ISO 9001:2015
Certificate of Accreditation Elite 2023
Certificate of Accreditation Standard 2023
News
Engineering
Definition
Products and services
Engineering Works
Steel
Industrial Plant
Industrialised Steel
Reinforced Steel
Steel Trading
Projects
Large Project
On-site Services
Reference Projects
Integral Solution
Our Solution
Products And Services
R+D+i
Our Partners
STEEL TECH (Texas)
AL CARAT (Saudi Arabia)
ATA (Algeria)
HHRR
Search form
Search
Search form
Search
Colector con Dovelas (Argentina)
You are here:
Home
Colector con Dovelas (Argentina)
DESCRIPTION
Principales Características:
‒
Conducto de túnel construido con tuneladora escudo y dovelas de 3,900 mm de diámetro interno
‒
Inversión de mas de 10,000 de pesos
‒
23 Km de
R
ío Subterráneo
SIMILAR WORKS
Estacion Bombeo Pradera
PTAR Arraiján
Pachacutec PTAR
Pachacutec Water Treatment Plant
Steel Piles PTAR Juan Diaz
PTAR Arriajan
Colector con Dovelas (Argentina)
Potabilizadora Belgrano (Argentina)
Panama water treatment Plant (Panama)
Gamboa water treatment Plant (Colon, Panama)
Santiago water treatment Plant (Veraguas, Panama)
Adriatic Liquefied Natural Gas Terminal
Barro Blanco Dam
Bajo Frío Dam
Honaire Desalination Plant
WORKS OF THE COUNTRY
Centre de transfer de Saenz
Colector con Dovelas (Argentina)
Potabilizadora Belgrano (Argentina)
Pilotes Hincados Garin (Argentina)
Torre Córdoba
Highway Paseo del Bajo Section A
DETAILS
Categories:
Obra Civil
Subtype:
Hydraulic Work
Location of the works:
Rio Lomas, Argentina
Customer:
CMC Di Ravenna – Argentina Branch
T of steel:
5.500 Tn
© Copyrights
2017
ERSIGROUP -
Legal Notice
-
Privacy Policy