Parking on Serrano Street
The redevelopment of Calle Serrano was one of the most significant urban regeneration projects carried out in Madrid over the last decade, transforming one of the city’s main shopping streets through extensive urban renewal and the construction of three large underground car parks. The project spanned over two kilometres, from María de Molina to Plaza de la Independencia, with the aim of improving mobility, expanding pedestrian areas, increasing green spaces and modernising urban infrastructure whilst maintaining the area’s intense commercial activity and traffic throughout the works
ERSIGROUP was involved in the project by supplying, fabricating and erecting the necessary reinforcement for piles, diaphragm walls, slabs and structural elements in the three car parks. The project presented a high degree of technical complexity as it was carried out in the very centre of Madrid, with extreme space constraints for storage areas, the presence of historic buildings, constant traffic and the coexistence with other underground infrastructure, including the new high-speed rail tunnel that runs parallel to part of the site
To optimise construction times, industrialised solutions were implemented based on the systematic prefabrication of reinforcement, piles and diaphragm walls. Furthermore, a top-down construction method was employed, which allowed traffic to continue flowing during the works. The car parks incorporated prefabricated slabs made of prestressed hollow-core panels, enabling the removal of intermediate columns and maximising the usable parking area. Thanks to logistical coordination, the rationalisation of reinforcement works and ERSIGROUP’s expertise, it was possible to complete a highly complex project whilst minimising disruption to the urban environment and ensuring high standards of quality and safety
KEY MILESTONES:
- Comprehensive refurbishment of over 2 kilometres of Calle Serrano
- Construction of 3 underground car parks
- Creation of over 3,000 parking spaces
- Over 87,800 linear metres of piles and diaphragm walls
- Piles up to 21 metres deep
- Over 125,000 m³ of concrete poured
- Over 65,000 m² of precast floor slabs
- Works carried out whilst maintaining traffic flow and commercial activity throughout the project
- Application of industrialised systems and advanced prefabrication of reinforcement by ERSIGROUP
details
- Categories:
- Edification
- Sub-type:
- Buildings and Public Centres
- Location:
- Madrid, Spain
- Customer:
- UTE Serrano: Dragados-Ferrovial Agroman
- Tn of Steel:
- 12.000 Tons
works images
works of the country
related works
- Extension of the Prado Museum
- St Ignatius of Loyola University
- Bolivarian Games Stadium
- New Aqs Steel Mill
- Headquarters Arab Gulf Bank Of Algeria
- Talara Refinery And Walls Rack
- Industrial Ship – Containers of Itsmo
- Electric Transmission Line Milagros-Bobahoyos
- Garin Piles
- Saenz Transport Hub
- Saga Falabella Distribution Center
- Brent Cross South