DESCRIPTION
ERSI Group manufactures and assembles industrial corrugated steel reinforcements for the Gambeta tunnel (Callao).
This tunnel is 950 metres long underneath the new runway at the Jorge Chávez International Airport
First Smart Tunnel in Peru