DESCRIPTION
Design optimization, manufacture and fixing of pre-fabricated reinforcing steel structures
Main features:
‒Viaduct included in section C2 and C3, part of HS2 (High Speed Line) between London and Birmingham
‒UK's first major railway viaduct to be built prefabricated off-site
‒Longitudinal 880 metres