DESCRIPTION
ERSI Group carried out the manufacture and assembly of industrial corrugated steel reinforcements for the Vidin-Calafat bridge, also called Bridge II of the Danube.
The bridge has a length between abutments of 1391 ml, in addition to an access viaduct to the bridge of 400 ml. Its foundation is formed by reinforced concrete piles, with a diameter of 2 metres, depths ranging from 60 to 80 metres under the pile cap.
The structures executed were four viaducts, seven flyovers and one underpass.
Second link between Bulgaria and Romania crossing the Danube river.