Long Itchington Tunnel HS2 – North Portal (UK)

DESCRIPTION

Design optimization, manufacture and fixing of pre-fabricated reinforcing steel structures

Main Features:

Run under the forest with a tunnel boring machine as environmental protection is an important part of the HS2 line strategy.
Length 1.6 km.

DÉTAILS

Categories:
Obra Civil
Sous-type:
Tunnels
Situation du chantier:
Royaume-Uni
Client:
ABM Precast Solutions
Tonnes d'acier:
200 Tons

© Copyrights 2017 ERSIGROUP - Avis Légal - Politique de Confidentialité