Vidin Bridge

Vidin Bridge

Vidin Bridge ERSIGROUP carried out the manufacture and assembly of industrial corrugated steel reinforcements for the Vidin-Calafat bridge, also called Bridge II of the Danube The bridge has a length between abutments of 1391 ml, in addition to an access viaduct to...
Gambeta Tunnel

Gambeta Tunnel

Gambeta Tunnel ERSIGROUP manufactures and assembles industrial corrugated steel reinforcements for the Gambeta tunnel (Callao) This tunnel is 950 metres long underneath the new runway at the Jorge Chávez International Airport First Smart Tunnel in Peru details...
Punta Rincon Minera Port

Punta Rincon Minera Port

Punta Rincon Port   Supply, processing and assembly of corrugated steel in drawers with dimensions of 22 meters x 21 meters x 7 meters Important milestone for the project Minera Panama details Categories: Civil work Subtype: Maritime Works Location: Colón,...
Guadalajara Light Rail Tunnel

Guadalajara Light Rail Tunnel

Guadalajara light rail tunnel ERSIGROUP supplies, manufactures and assembles industrial corrugated steel reinforcements for the tunnel of the Guadalajara Light Train (Jalisco) Line 3 of the Guadalajara Light Rail will be the third of the Urban Electric Train System...
Brasil Corridor Highway – Sections 1 & 2

Brasil Corridor Highway – Sections 1 & 2

Brasil Corridor Highway – Sections 1 & 2 Supply, processing and assembly of corrugated steel Modernization of land infrastructures in Panama City Improving road connectivity between the North corridor and the South corridor details Categories: Civil Work...