Panama Subway L2 – Airport Prolongation
Supply, manufacture, prefabrication and assembly of corrugated steel industrial reinforcement
Design that allows removing pile caps
Welded pile cages up to 3 m diameter with double layer and spiral
Bartec System for couplers
80% of prefabricated elements
400 tons rebar saving
details
- Categories:
- Civil Work
- Subtype:
- Subway
- Location:
- Panama
- Customer:
- Consorcio Línea 2 Ramal (OEC - FCC)
- Tn of steel:
- 6.000 Tons
work images
