Supply, manufacture, prefabrication and assembly of corrugated steel industrial reinforcement.
Principal features:
•Design that allows removing pile caps
•Welded pile cages up to 3 m diameter with double layer and spiral
•Bartec System for couplers
•80% of prefabricated elements
•400 tons rebar saving
details
- Categories:
- Civil Work
- Subtype:
- Subway
- Location:
- Panama
- Customer:
- Consorcio Línea 2 Ramal (OEC - FCC)
- Tn of steel:
- 6.000 Tons
work images
