Thames Valley Viaduct
Design optimization, manufacture and fixing of pre-fabricated reinforcing steel structures
Viaduct included in section C2 and C3, part of HS2 (High Speed Line) between London and Birmingham
UK’s first major railway viaduct to be built prefabricated off-site
Longitudinal 880 metres
details
- Categories:
- Civil Work
- Subtype:
- Bridges and Viaduct
- Location:
- United Kingdom
- Customer:
- Pacadar UK Limited
- Tn of steel:
- 164 Tons
work images
