Thames Valley Viaduct

Design optimization, manufacture and fixing of pre-fabricated reinforcing steel structures

Viaduct included in section C2 and C3, part of HS2 (High Speed Line) between London and Birmingham

UK’s first major railway viaduct to be built prefabricated off-site

Longitudinal 880 metres

details

  • Categories:
  • Civil Work
  • Subtype:
  • Bridges and Viaduct
  • Location:
  • United Kingdom
  • Customer:
  • Pacadar UK Limited
  • Tn of steel:
  • 164 Tons

work images