Description of work: Supply, fabrication, assembly of corrugated steel in pile fabrication
Main Features:
‒Viaduct of 1.8 kilometers in length.
‒Two electrified tracks for mixed use of freight and passenger trains.
‒Piles with depths of between 28 and 46 meters.
details
- Categories:
- Civil Work
- Subtype:
- Bridges and Viaduct
- Ubicación:
- Biobio, Chile
- Customer:
- SACYR CHILE S.A.
- Tn of steel:
- 3.500 Tons
work images
