Vidin Bridge
ERSIGROUP carried out the manufacture and assembly of industrial corrugated steel reinforcements for the Vidin-Calafat bridge, also called Bridge II of the Danube
The bridge has a length between abutments of 1391 ml, in addition to an access viaduct to the bridge of 400 ml. Its foundation is formed by reinforced concrete piles, with a diameter of 2 metres, depths ranging from 60 to 80 metres under the pile cap
The structures executed were four viaducts, seven flyovers and one underpass
Second link between Bulgaria and Romania crossing the Danube river
details
- Categories:
- Civil Work
- Subtype:
- Bridges and Viaduct
- Location:
- Vidin-Calafat - Romania, Bulgaria
- Customer:
- FCC Construcción S.A.
- Tn of steel:
- 20.000 Tons
work images
