Viaduc Thames Valley (UK)

DESCRIPCIÓN

Design optimization, manufacture and fixing of pre-fabricated reinforcing steel structures

Main features:

Viaduct included in section C2 and C3, part of HS2 (High Speed Line) between London and Birmingham
UK's first major railway viaduct to be built prefabricated off-site
Longitudinal 880 metres

DETALLES

Categorías:
Obra Civil
Subtipo:
Puentes y Viaductos
Ubicación:
Reino Unido
Cliente:
Pacadar UK Limited
Tn. de acero:
164 Tons

© Copyrights 2017 ERSIGROUP - Aviso Legal - Política de Privacidad