Chanquinola Tunnel

Supply, fabrication, prefabrication and assembly of corrugated steel for the repair of hydraulic tunnel

Repair of hydraulic tunnel with reinforced concrete of 100 m2 section

Reinforced tunnel reinforcement with different slopes from 1%-14%

Connection between tunnel and balancing fireplace

details

  • Categories:
  • Civil Work
  • Subtype:
  • Tunnels
  • Location:
  • Changuinola, Panama
  • Customer:
  • Consorcio Cobra Infraestructura e Hispano Sueca de Ingeniería
  • Tn of steel:
  • 10.000 Tons

work images