Scope of work: Supply, fabrication, prefabrication and assembly of corrugated steel for the repair of hydraulic tunnel.
Main features:
-Repair of hydraulic tunnel with reinforced concrete of 100 m2 section.
-Reinforced tunnel reinforcement with different slopes from 1%-14%.
-Connection between tunnel and balancing fireplace.
details
- Categories:
- Obra Civil
- Subtype:
- Tunnels
- Location:
- Changuinola, Panama
- Customer:
- Consorcio Cobra Infraestructura e Hispano Sueca de Ingeniería
- Tn of steel:
- 10.000 Tons
work images
