Scope of work: Supply, fabrication, prefabrication and assembly of corrugated steel for the repair of hydraulic tunnel.

 

Main features:

-Repair of hydraulic tunnel with reinforced concrete of 100 m2 section.
-Reinforced tunnel reinforcement with different slopes from 1%-14%.
-Connection between tunnel and balancing fireplace.

details

  • Categories:
  • Obra Civil
  • Subtype:
  • Tunnels
  • Location:
  • Changuinola, Panama
  • Customer:
  • Consorcio Cobra Infraestructura e Hispano Sueca de Ingeniería
  • Tn of steel:
  • 10.000 Tons

work images