Chanquinola Tunnel
Supply, fabrication, prefabrication and assembly of corrugated steel for the repair of hydraulic tunnel
Repair of hydraulic tunnel with reinforced concrete of 100 m2 section
Reinforced tunnel reinforcement with different slopes from 1%-14%
Connection between tunnel and balancing fireplace
details
- Categories:
- Civil Work
- Subtype:
- Tunnels
- Location:
- Changuinola, Panama
- Customer:
- Consorcio Cobra Infraestructura e Hispano Sueca de Ingeniería
- Tn of steel:
- 10.000 Tons
work images
