Supply, fabrication, and assembly of industrial corrugated steel reinforcement.

Main features:

The plant will strengthen the hydraulic ring systems of the West Line II, ensuring a 24-hour water supply for a population of more than 235,000 Panamanians.

One of the largest water treatment facilities in the Republic of Panama.

Guaranteed production capacity of 246,000 m³/day (65 MGD), with the possibility of expansion to 322,000 m³/day (85 MGD).

details

  • Categories:
  • Civil work
  • Subtype:
  • Hydraulic Work
  • Location:
  • Colón, Panama
  • Customer:
  • WATER CONSORTIUM FOR GAMBOA (Constructions Civils Générales S.A. - Water Desalination techniques S.A.)
  • Tn of steel:
  • 2.500 Tons