DESCRIPCIÓN
Description of the works: Elaboration and reinforcement of corrugated steel industrial rebar's. Prefabrication of steel piles.
Main Features:
- Construction of 11 km of highway, eight lanes on the main trunk highway.
- Three lanes in each direction with a central platform of two reversible rails to speed up traffic during rush hour.
- Six interchangers.