HS2 Voussoir Tunnel (Sector C2 C3)

HS2 Voussoir Tunnel (Sector C2 C3)

Description of the works: Manufacturing and prefabrication of tunnel segments weighing between 1.5 and 6.5 tons per piece. Main characteristics: The largest investment in rail infrastructure undertaken in northern England, with 250 miles of new planned high-speed...
Long Itchington Tunnel HS2 – North Portal (UK)

Long Itchington Tunnel HS2 – North Portal (UK)

Design optimization, manufacture and fixing of pre-fabricated reinforcing steel structures Main Features: ‒Run under the forest with a tunnel boring machine as environmental protection is an important part of the HS2 line strategy.‒Length 1.6 km. details Categories:...
Viaducto Small Dean (UK)

Viaducto Small Dean (UK)

Design optimization, manufacture and fixing of pre-fabricated reinforcing steel structures Main features: ‒One of only two places in the Chilterns where the HS2 line will be above ground level.‒Longitudinal 345 metres details Categories: Civil Work Subtype: Bridges...
Viaduc Thames Valley (UK)

Viaduc Thames Valley (UK)

Design optimization, manufacture and fixing of pre-fabricated reinforcing steel structures Main features: ‒Viaduct included in section C2 and C3, part of HS2 (High Speed Line) between London and Birmingham‒UK’s first major railway viaduct to be built...