Lima Subway – L2

Lima Subway – L2

Lima Subway – L2 Assembly of corrugated steel and concrete formwork Line 2 stretches 34.6 km from the district of Villa El Salvador, where the Backyard is, to the Bayóvar Station, in the district of San Juan de Lurigancho. As it has been built on an elevated...
Port Callao – Expansion

Port Callao – Expansion

Port Callao Expansion ERSIGROUP supplies, manufactures and assembles industrial corrugated steel reinforcements for the expansion of the Port of Callao Construction and operation of a multi-purpose north terminal of the Port of Callao The Port of Callao is considered...
Sima Pier – Expansion

Sima Pier – Expansion

Sima Pier – Expansion ERSIGROUP supplied, manufactured and assembled industrial corrugated steel reinforcements The expansion and improvement project of the shipyard and industrial plant of SIMA Perú includes the construction of new facilities in the...
Gambeta Tunnel

Gambeta Tunnel

Gambeta Tunnel ERSIGROUP manufactures and assembles industrial corrugated steel reinforcements for the Gambeta tunnel (Callao) This tunnel is 950 metres long underneath the new runway at the Jorge Chávez International Airport First Smart Tunnel in Peru details...
Vegas Plaza Shopping Center

Vegas Plaza Shopping Center

Vegas Plaza Shopping Center Supply, processing and assembly of industrial reinforcement of corrugated steel Built surface of approximately 37,500 m2 will have seven levels, 250 stores of national and international brands, food court, supermarket, entertainment spaces,...