HS2 Segmental Tunnel – Sector C2 C3

HS2 Segmental Tunnel – Sector C2 C3

HS2 Segmental Tunnel – Sectors C2 and C3 Manufacturing and prefabrication of tunnel segments weighing between 1.5 and 6.5 tons per piece The largest investment in rail infrastructure undertaken in northern England, with 250 miles of new planned high-speed lines,...
4TH Bridge Over the Canal

4TH Bridge Over the Canal

4th Bridge over the Panama Canal Supply, fabrication and installation of corrugated steel for foundation piles, the abutments of the main piers, bridgeheads, the main bridge deck and underpasses A six-lane cable-stayed bridge linking Panama City with West Panama, with...
Armuelles Port

Armuelles Port

Port of Armuelles – Expansion Supply and fabrication of industrial reinforced steel rebar and piles for foundations and beams Transformation into a multipurpose port for the storage and transportation of goods and industrial development It will strengthen the...
HS2 Long Itchington Tunnel – North Portal

HS2 Long Itchington Tunnel – North Portal

Long Itchington Tunnel HS2- Salb Roofs Design optimization, manufacture and fixing of pre-fabricated reinforcing steel structures Run under the forest with a tunnel boring machine as environmental protection is an important part of the HS2 line strategy Length 1.6 km...
Small Dean Viaduct – Beams

Small Dean Viaduct – Beams

Small Dean Viaduct – Beams Design optimization, manufacture and fixing of pre-fabricated reinforcing steel structures One of only two places in the Chilterns where the HS2 line will be above ground level Longitudinal 345 metres details Categories: Civil Work...