Bajo Frio Dam

Bajo Frio Dam

Bajo Frio Dam ERSIGROUP supplied, manufactured and assembled industrial corrugated steel reinforcements. The work is located in the province of Chiriquí, near the border with Costa Rica. The objective of the project is the hydroelectric exploitation of the waterfall...
Barro Blanco Dam

Barro Blanco Dam

Barro Blanco Dam ERSIGROUP supplied, manufactured and assembled industrial corrugated steel reinforcements The Barro Blanco dam is located on the Tabasará river, in the province of Chiriquí. It is a hydroelectric energy project in Panama, with an installed capacity of...
Panama L2 Subway

Panama L2 Subway

Panama Subway Line 2 ERSIGROUP carried out the manufacture, assembly and prefabrication of reinforcing steel reinforcements (mobilisation, manufacture, cut and bend), prefabrication of piles and piers and prefabrication of capitels Line 2 of the Panama metro will have...
Expansion Port Rodman

Expansion Port Rodman

Expansion of Rodman Port ERSIGROUP carried out prefabrication of reinforcing steel reinforcements (mobilisation, manufacture, cut and bend), prefabrication and assembly of piles, capitels, slabs and preslabs The work involves the construction of 800 metres of dock and...
Chicho Fabrega Hospital

Chicho Fabrega Hospital

Chicho Fabrega Hospital ERSIGROUP supplied, manufactured and assembled industrial corrugated steel reinforcements The Medical Centre made by Spanish architects, has been executed under the strictest criteria of respect for the environment taking into account the...