Quito L1 Subway – 2nd Phase

Quito L1 Subway – 2nd Phase

Quito L1 Subway – 2nd Phase ERSIGROUP supplied, manufactured and assembled industrial corrugated steel reinforcements Line 1 will be the first underground route to operate in the Quito Metro. The stretch consists of 22 km in length and 15 stations. It is...
Electric Transmission Line Milagros-Bobahoyos

Electric Transmission Line Milagros-Bobahoyos

Electric Transmission Line Milagros – Bobahoyos Electrical substations. 230 kV, 47 km in length that will guarantee an adequate electrical supply Supplies and manufactures industrial corrugated steel reinforcements details Categories: Edification Subtype:...
Pradera Pumping Station

Pradera Pumping Station

Pradera Pumping Station Supply, fabrication, erection of corrugated steel panels and other structures Financed by the European Investment Bank Installed pumping capacity of 6,400 liters per second (553,000 m3/day) It will serve 1/3 of the total population of...