WWTP Fuenlabrada-Culebro

WWTP Fuenlabrada-Culebro

Fuenlabrada–Culebro WWTP Primary Sewer Collector The Fuenlabrada–Culebro WWTP Primary Sewer Collector is one of the most significant hydraulic infrastructure projects developed to improve the conveyance of wastewater and stormwater in the southern metropolitan area of...
Bullarque Canal

Bullarque Canal

Bullarque Canal Developed in Ciudad Real, it forms part of a major water management project aimed at modernising the irrigation infrastructure and ensuring a sustainable water supply for Ciudad Real and the surrounding region. The works involved lining 18.5 kilometres...
Honaine Desalination Plant

Honaine Desalination Plant

Honaine Desalination Plant ERSIGROUP supplied, manufactured and assembled industrial corrugated steel reinforcements The Honaire plant has the capacity to produce, using a reverse osmosis system, around 200,000 m3 of drinking water per day and caters to a population...
Bajo Frio Dam

Bajo Frio Dam

Bajo Frio Dam ERSIGROUP supplied, manufactured and assembled industrial corrugated steel reinforcements. The work is located in the province of Chiriquí, near the border with Costa Rica. The objective of the project is the hydroelectric exploitation of the waterfall...
Barro Blanco Dam

Barro Blanco Dam

Barro Blanco Dam ERSIGROUP supplied, manufactured and assembled industrial corrugated steel reinforcements The Barro Blanco dam is located on the Tabasará river, in the province of Chiriquí. It is a hydroelectric energy project in Panama, with an installed capacity of...