Palo Alto Wind Farm

Palo Alto Wind Farm

“Palo Alto” Wind Farm ERSIGROUP supplied, manufactured and assembled industrial corrugated steel reinforcements. “Palo Alto” is composed of 43 wind turbines with a capacity of 3 MW each, capable of generating over 350 GWh per year, and at the same time...
Siervo De La Nación Viaduct

Siervo De La Nación Viaduct

Servant of the Nation Viaduct ERSIGROUP supplies, manufactures and assembles industrial corrugated steel reinforcements for the Siervo de la Nación Viaduct With a total length of 14.5 km, 90% of which has been constructed as a four-lane elevated viaduct First Mexican...
Bajo Frio Dam

Bajo Frio Dam

Bajo Frio Dam ERSIGROUP supplied, manufactured and assembled industrial corrugated steel reinforcements. The work is located in the province of Chiriquí, near the border with Costa Rica. The objective of the project is the hydroelectric exploitation of the waterfall...
Algerian Subway

Algerian Subway

Algerian Subway ERSIGROUP carried out the supply, manufacture and assembly of screens and piles The project consists of the extension of line 1 of the Algiers metro between the neighbourhood of El Harrach and the Airport. It includes the construction of a stretch of 9...
Azores Motorway Viaduct

Azores Motorway Viaduct

Azores Motorway Viaduct ERSIGROUP carried out the supply, manufacture and assembly of industrial corrugated steel reinforcements for the construction of almost 60 km of the Scut Azores motorway in the Azores archipelago The work carried out includes 23 viaducts, 21...