Brasil Corridor Highway – Sections 1 & 2

Brasil Corridor Highway – Sections 1 & 2

Brasil Corridor Highway – Sections 1 & 2 ERSIGROUP supplied, manufactured and installed corrugated steel for the project’s various infrastructure elements   This is a key part of the project to modernise land transport infrastructure in Panama City, improving...
Panama Subway L2 – Precast

Panama Subway L2 – Precast

Panama Metro L2 Precast Elements Carried out the manufacture, assembly and prefabrication of reinforcing steel reinforcements (mobilisation, manufacture, cut and bend), prefabrication of piles and piers and prefabrication of capitels Line 2 of the Panama metro will...
Paseo Bajo Highway – Section A

Paseo Bajo Highway – Section A

Paseo Bajo Motorway – Section A   ESIGROUP carried out the supply, fabrication and installation of industrial corrugated steel formwork for the construction of the entire structure comprising abutments, columns, lintels and deck slabs 6.7 km connecting the...
Gamboa WTP

Gamboa WTP

Gamboa Wastewater Treatment Plant Supply, fabrication, and assembly of industrial corrugated steel reinforcement The plant will strengthen the hydraulic ring systems of the West Line II, ensuring a 24-hour water supply for a population of more than 235,000 Panamanians...
Santiago Water Treatment Plant

Santiago Water Treatment Plant

Santiago Water Treatment Plant Supplied, manufactured and assembled industrial corrugated steel reinforcements It will benefit more than 90 thousand residents of the capital of Veracruz and its surroundings It will increase the production of potable water for the...