Description of work: Supply, fabrication, assembly of corrugated steel in pile fabrication

 Main Features:

‒Viaduct of 1.8 kilometers in length.
‒Two electrified tracks for mixed use of freight and passenger trains.
‒Piles with depths of between 28 and 46 meters.

details

  • Categories:
  • Civil Work
  • Subtype:
  • Bridges and Viaduct
  • Ubicación:
  • Biobio, Chile
  • Customer:
  • SACYR CHILE S.A.
  • Tn of steel:
  • 3.500 Tons

work images