Design optimization, manufacture and fixing of pre-fabricated reinforcing steel structures
Main Features:
‒Run under the forest with a tunnel boring machine as environmental protection is an important part of the HS2 line strategy.
‒Length 1.6 km.
details
- Categories:
- Civil Work
- Subtype:
- Tunnels
- Location:
- United Kingdom
- Customer:
- ABM Precast Solutions
- Tn of steel:
- 200 Tons
work images
