Gambeta Tunnel

Gambeta Tunnel

ERSIGROUP manufactures and assembles industrial corrugated steel reinforcements for the Gambeta tunnel (Callao). This tunnel is 950 metres long underneath the new runway at the Jorge Chávez International Airport First Smart Tunnel in Peru details Categories: Civil...
Port Punta Rincon – Minera

Port Punta Rincon – Minera

Supply, processing and assembly of corrugated steel in drawers Main features: – Important milestone for the project Minera Panama – Concrete drawers with dimensions of 22 meters x 21 meters x 7 meters details Categories: Civil work Subtype: Maritime...
Guadalajara Light Rail Tunnel

Guadalajara Light Rail Tunnel

ERSIGROUP supplies, manufactures and assembles industrial corrugated steel reinforcements for the tunnel of the Guadalajara Light Train (Jalisco). Line 3 of the Guadalajara Light Rail will be the third of the Urban Electric Train System that will provide collective...
Vías Brasil Corridor – Sections 1 and 2

Vías Brasil Corridor – Sections 1 and 2

Supply, processing and assembly of corrugated steel Main Features: – Modernization of land infrastructures in Panama City – Improving road connectivity between the North corridor and the South corridor details Categories: Civil work Subtype: Motorway...
Panama L2 Metro

Panama L2 Metro

 carried out the manufacture, assembly and prefabrication of reinforcing steel reinforcements (mobilisation, manufacture, cut and bend), prefabrication of piles and piers and prefabrication of capitels. Line 2 of the Panama metro will have 16 stations and 21...