Supply, manufacture, prefabrication and assembly of corrugated steel industrial reinforcement.

 

Principal features:

•Design that allows removing pile caps
•Welded pile cages up to 3 m diameter with double layer and spiral
•Bartec System for couplers
•80% of prefabricated elements
•400 tons rebar saving

details

  • Categories:
  • Civil Work
  • Subtype:
  • Subway
  • Location:
  • Panama
  • Customer:
  • Consorcio Línea 2 Ramal (OEC - FCC)
  • Tn of steel:
  • 6.000 Tons

work images